When Should Quality Control Take Place?
At Trazzor, we implemented a quality control team on three stages: at the beginning, mid-point, and after the production.
Before the actual manufacture begins:
The quality control team should check the quality of raw textiles and accessories, size, color, and other specific important details that are different from the prior communication with clients.
At the mid-point of the manufacture:
The quality control team will perform spot checks for overall make quality as the products progress through the production line. We can stop the production line immediately if the team finds out there is a discrepancy that needs to be fixed. Many manufacturers neglect this crucial step.
At the end of the production:
The quality control team will run 100% quality control checks. That means they will check every detail on each piece to ensure that the product looks as expected, whether the colors have changed following washing, are the stitches holding, is the final product as same as in the Spec Sheet, does it pass any required testing, does it match the pre-approved sample, etc. – all the final checks before the product leaves the manufacturer.
To avoid failing the final inspection and rejecting the goods, all of the above checks are required.
Contact us
When it comes to garments, the main concerns are always fit, comfort, and quality. Trazzor's primary concern is customer satisfaction. Trazzor implements a quality control team for on-site testing in the factory to do 100% quality checks. That means our team will check all the details for every single piece to ensure items are as they should be.
Trazzor is an apparel manufacturer for clothing brands. We provide a full package from design, fabric sourcing, pattern making, size grading, sampling, production, quality control, packaging, and logistics.
If you have any questions please email us or ask us to see more samples and swatches info@trazzor.com or schedule a meeting with us: https://meetings.hubspot.com/jeremy610.
Comments